image description

Electric Power Associations

arch-electrical-NCEPA

Magnolia-Render3

Key Project and Design Factors

  • Facility Age and Condition
  • Personal Safety
  • Building Hardening to FEMA 361 Disaster Standards
  • Backup Power Generation
  • Communications Protection/Data Backup
  • Dispatch/Critical Operations
  • Maintenance/Operations Areas
  • Power Utility Architecture and Master Planning
  • Electrical Transmission and Substation Design
  • Disaster Management and Safe Room Design
  • Site, Space, and Master Planning
  • Construction Documents, Drawings and Specifications
  • Cost Estimating and Benefit Analysis
  • Contract Bidding, Analysis, and Recommendations
  • Construction Observation