MENU

Mayor Lane Sewer Pump Station

CIVIL

Fisher Arnold was retained by Conway Corporation to design a new $3.5 million sewer lift station to replace an existing station known as Mayor Lane East. The new station includes three submersible pumps with room for a fourth in a deep wet well, an electrical control building, a separate valve vault, a metering vault, a connection to a gravity sewer main, and a connection to a 24” force main. The station will pump up to 14 million gallons per day.